Daniel Raks Oy

Home  /  References

References

Daniel Raks Oy projects

We have carried out new construction and renovation projects in Pirkanmaa and elsewhere in Finland together with Finland's leading construction companies: industrial sites, apartment buildings, commercial premises and public buildings.

Below you'll find examples of our projects. More photos from our sites are in the gallery.

Laattojen raudoitus teollisuushallissa

Industry · 2026

Kotka CAM battery­materials plant

The CAM plant in Keltakallio, Kotka, is Finland's first cathode active material plant. It produces NMC cathode material for electric vehicle lithium-ion batteries – a large industrial site that demands precision, safety and staying on schedule.

On this project we carried out formwork, reinforcement, concrete work and diamond drilling and sawing with our own team and our own equipment. Large slabs, foundations and structures were built according to the drawings and on the main contractor's schedule.

Sector

Battery industry

Location

Keltakallio, Kotka

Year

2026

Project

CAM plant (cathode material)

Work

Formwork, reinforcement, concrete, diamond work

Capacity

60,000 t / year

Projects

Our projects

New construction and renovation projects in Tampere and Pirkanmaa.

Paletti 1, 2, 3 Sammonkatu, 33540 TAMPERE

Apartment buildings

Paletti 1, 2, 3 – Sammonkatu

A new build of three apartment buildings in Kaleva. We carried out reinforcement and concrete work on the frame and finishing of the concrete surfaces.

Work

Ristinarkuntie 18, 33560 TAMPERE

Apartment building

Ristinarkuntie 18

Sloped floors for the apartments' bathrooms and WCs, ready for waterproofing and tiling.

Work

Apartment building

Jäähallinraitti 1

Flooring for a new build: levelling and smoothing floors and sloped floors for the wet rooms.

Work

Sarvijaakontie 35, 33540 TAMPERE

Apartment building

Sarvijaakontie 35

Concrete finishing: chipping, grinding and patching, ready for skim coating and painting.

Work

Apartment buildings

Säästäjänkuja 1

On these apartment buildings we carried out the reinforcement and concrete work from the foundations to the slabs.

Work

Apartment building

Sorinkatu 4

Sloped floors for the bathrooms and WCs of the tower block apartments, and floor levelling.

Work

Public building

Sääksjärvi parish hall

Flooring and concrete finishing for the parish hall – neatly and on schedule.

Work

Apartment buildings

Rantatie 27–29

Reinforcement and concrete work on a new build, plus concrete finishing before the surface work.

Work

Clients

Our clients and partners

Photo gallery

Project photos

New builds we have been part of. Click a photo to see it larger.

New construction

The next reference could be your project

Tell us about the project and schedule, and we'll send you a quote quickly.

Scroll to Top